找词语>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • Thirdly, the framework of early-warning system for ill reservoir dam is set up with the Web GIS technology. Based on the above, the classification and the selection and the principle of the early warning index is studied, including the developing method for the index system.
    构建了基于WebGIS的病险水库大坝预警系统架构,在此基础上,研究了预警指标的分类、预警指标筛选的条件和原则以及指标体系的构建方法。
  • Guangdong Police smashed secret private banks in "dam up" action
    广东警方截流行动痛击地下钱庄
  • Jack is not such a man as can dam up his feeling.
    杰克不是能控制感情的人。
  • Thus it is very pressing for us integrating digital asset of TV media better, establishing the theory of digital asset management ( DAM), setting up operation modes and evaluation methods, etc..
    因而,对于如何更好的整合电视媒体的数字资产,构建基于数字资产管理(DAM,DigitalAssetManagement)的理论、运营模式及评价方法等,便成为当务之急。
  • They are going to dam up the river to set up a hydropower station.
    他们准备拦江筑坝建水电站。
  • A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.
    因此一般采用上游坝面铺设复合土工膜和坝基垂直防渗措施进行防渗漏处理。
  • On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
    本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。
  • Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
    因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。
  • A commission report said the dam could lose up to60 percent of its operating capacity in30 years, though, because of sediment building up in the reservoir.
    但是湄公河委员会的一份报告说,由于水库泥沙堆积,沙耶武里水电站有可能在30年的时间里失去60%的发电能力。